International Space Station Flight 3A. Integrated Truss Structure (ITS) Z1, Pressurized Mating Adapter 3 (PMA 3), Ku-band Communications System, Control Moment Gyros (CMGs)
The Shuttle Radar Topography Mission (SRTM) is an international project spearheaded by the National Imagery and Mapping Agency and NASA whose objective is to obtain the most complete high-resolution digital topographic database of the Earth.
ISS Assembly Flight 7A. Installation on the International Space Station of the Joint Airlock. This will give station crewmembers the capability of conducting spacewalks from the orbiting laboratory using either the Russian Orlan spacesuits or U.S. spacesuits.
The 12th shuttle mission to the International Space Station. Also known as ISS Assembly Flight UF-1, Space Shuttle Endeavour will deliver the Expedition Four Crew and return the Expedition Three crew to Earth. STS-108 will deliver the Raffaello Multi-Purpose Logistics Module to the station.
Expand the International Space Station by installing the initial section of a framework that eventually will hold systems needed to provide power and cooling for future research laboratories.
Fifth flight of the Italian built multipurpose logistics module (MPLM). Delivery of Expedition 5 crew to the ISS and three space walks to perform a variety of station servicing tasks.
ISS assembly flight. Install first left-side truss segment (ITS P1). Crew and Equipment Translation Aid (CETA) Cart B. Deliver the Expedition Six crew to the station and return Expedition Five to Earth.